Scope
Capacities, water demand, tank design, chlorine concentration
Deliverables:
Investigate what a Standard Penetration Test (used to get the bearing capacity of soil directly at a certain depth and estimate the consistency of clayey soils) and what a Jar test is and why they may be necessary for design of the tank foundation (WORKING)
Investigate what an Standard Operating Procedure is and when it is used in this project (WORKING)
Determine chlorinator location currently and in the future if different (DONE)
Identify the type of chlorinator currently in use (DONE)
Identify the maintenance history and future plan of the chlorinator currently in place
Design and locate water storage tank including overflow, inlet, outlet, and drain pipe sizes, and manway/access size and ladders for internal and external inspections and cleaning.
Create Operations and Maintenance (O&M) manual for chlorinator and tank